Pulling up the temporary rail at the UGM testing and storage facility to relocate it around the perimeter of the yard.
Last view of the temporary track.
Switch throw removed from a mine.
First remove the joiner plates.
Then pull the spikes. this was made easier because we only spiked every other tie.
Halfway done.
rail removed
There it is.
Ties pulled up.
rail moved over with the other extra rail. we are getting about 4 times this much tomorrow - 5-3-07
Some of our tools and what not, temporarily being stored in the mantrip car.