Joined: Sat Oct 29, 2005 8:32 pm Posts: 783
|
This is a side topic. One of the first controlled flushing project was titted "The Tripp slope project". Kinda of a dry run for later and larger projects. Tom Supey who was involved in some of the larger projects ( but not Tripp slope) told me that they used natural ventilation on that one. Said the guys had it horrible. Only able to work half a day because the black damp would creep up on them as daytime temps. increased. Needless to say on later projects the fans were installed.
Last edited by miner490 on Tue Feb 03, 2009 7:29 pm, edited 1 time in total.
|
|