Over all view of the prep plant
Early morning arrival
Mine Safety Signs (Fire Boss sign for each shift)
Man trip cars ready to go (CHECK OUT THE VID)
Locomotive storage building
They have an additional repair shop that is about 10 times the size of this building
Behind this building is the original sealed portal
BRAND NEW BROOKVILLE LOCOMOTIVE
Brookville controls
Continous miner in for repair
Continous miner front view of cutting head
Following the 50 ton Jeffrey locomotive down to the portal
New 5 mile overland conveyor coming in at the upper left side of the pic
Portals (the left one is used)
Track going up the steep grade to the prep plant & supply yard
Biggest rail we ever came across at a mine
130lbs per 3 ft. now that is like mainline railroading
Well I guess they call it their railroad
Another 50 ton locomotive for hauling supply trains in & out of the mine
Pete standing by a longwall shear head (it takes 1 on top & 1 on the bottom)
New prep plant
Empty mine car track lead from the rotary car dump building (double track)
They have not used this rotary car dump this since 1994, all conveyor now.
Rotary car dump for 20 ton cars
Probably the last mine car emptied on the pusher chain for the rotary dump
http://www2.ironminers.com/railhaul/MVI_3803.avi
http://www2.ironminers.com/railhaul/MVI_3871.avi