Dave, the incline is on the straight section, lower right corner, short spur on the level at the base of the bank. There is more formation to lay a longer siding but I don't need it, I also don't have rail to waste down there either, was forced to use up the old portable track which was only 1"sq box and some old 20lb shorts. I use a light skyline that takes the load right to the timbercar anyway, and that is way more versatile, it can be strung in different directions. Gravity does the rest. There are only two more trees left to log down there at this time, the rest can stay for a few more years.
Attachments: |

ReadyHoistAway.jpg [ 142.04 KiB | Viewed 30676 times ]
|

Hoist.jpg [ 150.99 KiB | Viewed 30676 times ]
|
_________________ Alive and Well....for now
|